Case Study

Dublin Port Tunnel

Dublin Port Tunnel is the largest ever civil engineering project in Ireland. To meet the client's requirements, the highly secure CEM AC2000 SE (Standard Edition) access control system was chosen.

The 752m Dublin Port Tunnel opened to traffic on December 2006. Spanning 5.6 km of motorway and acting as a link between Dublin Port and the national motorway network, Dublin Port Tunnel is the largest ever civil engineering project in Ireland. Featuring a twin bore tunnel of 4.5km in length and with a height clearance of 4.65m, the tunnel is one of the largest urban tunnels of its kind in Europe.

Security requirements...

The prestigious Dublin Port Tunnel required a comprehensive and fully integrated security management solution to integrate various security systems together. The goal was for a single security management system located at the main on-site control room, to centrally monitor and control the entire tunnel - creating a safe facility and environment for tunnel users.

Solution

To meet client's requirements, the highly secure CEM AC2000 SE (Standard Edition) access control system was chosen. Installed by ADT Dublin, the AC2000 SE system not only provides the tunnel with advanced access control, but also provides integration with intruder alarms and a large central Supervisory Control and Data Acquisition (SCADA) system.

Download Full Case Study

Case Summary

  • Location:
  • Dublin, Ireland
  • System Installed:
  • CEM
  • AC2000 SE (Standard Edition)

Download Case Study

 

SiteMap Terms Of Use Privacy Cookies Accessible Service Policy Site Feedback